AlanE Moderator
Joined: 29 Jun 2003 Posts: 1220 Location: Colchester Essex
|
Posted: Tue Jan 01, 2008 11:01 am Post subject: |
|
|
As this is a structural alteration that you propose your local building control dept will at some time need to be involved.
The best time for that is now, at the planning stage. Their advise is free and will be following a site visit. On a forum there is no way that any advise we give might be relevant to your particular situation. The roof structure is designed around span, timber size, angle together with roof coverings.
You need an expert to visit. |
|