confused from sutton
Joined: 03 Nov 2007 Posts: 12 Location: SUTTON
|
Posted: Sun Nov 04, 2007 11:36 pm Post subject: |
|
|
Thanks very much.
Just to clarify,
The builders have veered from the spec and we will talk to them re this, we do not have to redo the rooms already done. Is the conduit a gold standard or was this just an extra not relly required put in by the project manager?
Thanks |
|
| Back to top |
|
 |
vince knight Moderator
Joined: 04 Mar 2004 Posts: 1274 Location: Essex/East London
|
Posted: Sun Nov 04, 2007 11:43 pm Post subject: |
|
|
If it is within the zones then it is not required and you should NOT be charged for it.
Vince |
|
| Back to top |
|
 |
confused from sutton
Joined: 03 Nov 2007 Posts: 12 Location: SUTTON
|
Posted: Sun Nov 04, 2007 11:48 pm Post subject: |
|
|
Thanks again
Will sign off and hope you get a decent nights sleep
Stella |
|
| Back to top |
|
 |
vince knight Moderator
Joined: 04 Mar 2004 Posts: 1274 Location: Essex/East London
|
Posted: Sun Nov 04, 2007 11:49 pm Post subject: |
|
|
Still got paper work to do
Good luck
Vince |
|